Together with shop-floor management, we implemented a system for daily performance monitoring, measurement, and evaluation. We also established a process to identify and resolve discrepancies in data and results on a daily basis.
After the process had stabilized, we helped introduce a welder bonus system to provide continuous motivation for all workers. As a result, efficiency increased by 23%.
We revised BOMs, technological data, and cost calculations. The comparison of planned versus actual costs became the basis for the sales pricing strategy and the company budget.
About the company
Area Four Industries (a4i.com) is today the world market leader in lightweight construction systems, mainly for the entertainment industry. It develops, manufactures and sells its own products, and carries out large atypical projects. A4I Group owns several world brands, such as Prolyte, Milos, Litec, Tomcat, EXE. Production plants are located in the Czech Republic, Italy, USA and China.

František Zykan, Managing director
Initial situation
The daily production output was laboriously recorded on paper, and then from one excel spreadsheet to another. There were very inaccurate time standards in Excel, all the data was full of inaccuracies and errors, taken with considerable delay. There was not much tracking of the results, no one trusted the data because the checksums sometimes did not agree.
Administration with minimal added value burdened one full-time person. There were rates per standard hour in the calculations that no one could explain. The monthly economic results only showed Cost Of Goods Sold against sales, however COGS could not be broken down into materials and labor either.
What needed to be resolved
In order to monitor efficiency, it was necessary to provide daily truthful information about what was produced. We eliminated the Start-Stop tracking for each operation of each product because of the greater demands on discipline, the different types of non-standard situations, and the greater administrative effort.
Furthermore, the time standards had to be corrected to more accurately reflect the intensity of the work. Based on this data, then set up reporting, people evaluation and start to deal with real cost calculations for production.
How we solved it
At the beginning we were deciding whether to go the revolutionary route and implement a new ERP system. Considering the little experience people had with using the existing system, we chose the evolutionary way – to use the existing functions of the system and supplement them with simple tools. This will also motivate everyone to use the system more away from papers and excel spreadsheets.
The reprogramming and implementation of QR code scanning on the workshop was solved within 4 weeks. However, it took considerably longer to correct the time standards on the order of 2000 active products. This was done using both objective parameters (type and length of welds) and subjective assessment – measurements on the shop floor and the breakdown of products according to complexity. At the same time, partial projects to increase efficiency were already underway – new fixtures, workplace layout, handling times. Thanks to the daily outputs, it was possible to gradually monitor the average efficiency per individual worker and also per product.
After a few months, we had better data on which to set realistic targets for efficiency improvements. Historical records are compared against current time standards, so it was possible to assess a 23% increase in efficiency after two years.
The real costs of individual products and the overall gross efficiency of the production team then began to be used to develop pricing, budgets and strategic goals for the company.